Sunday, December 28, 2008

Final Preparations

Now that I had finally finished with the benchwork and put down the base of foam, it was time to see how things would actually fit on the layout. First I drew in the most of the track plan and then began placing cardboard mock-ups of the major buildings I hope to use. Once again this proved to be rather frustrating. I have already had to make many compromises to allow for the space I have available and now it seemed that none of the scenes I have visualized were going to fit either. Finally after many hours of pondering and moving buildings around I figured it out. It would required another slight modification to the base and benchwork but all the scenes I hoped to have on the layout should fit.
Although I don't
think I'll be able to have passenger trains due to the tight radius curves I still wanted a depot andI wanted it in a particular place. I also had wanted an oil dealership, a coal dealer and a furntiture factory and lumber yard, all industries that would be located in the mountains of NC. And I will have my truss bridge over a river and hopefully I can develop the scenery making skills to do a decent river and waterfall.

1 comment:

Anonymous said...

Handbags Hermes[url=http://www.likebirkin.com]Birkin Bags[/url] accessories Replica Hermes[url=http://www.hotbirkinbags.com]Hermes Belts[/url] stuff